I wrote a program for a LED display. The program allows to set the refresh rate via webconfiguration. To meet the refresh rate I measure the processing time of a loop. At the end I calculate the delay and wait until the next loop.
e.g. Refresh Rate 5 Hz -> 200 milli seconds for one loop. 50 milli seconds computing time results in 150 milli seconds delay.
The ratio of process time (50 milli seconds) to total time (200 milli seconds) indicates the processor load of my program. But to find the optimal setting, I need the actual total processor load. And not only that of my program. But since I don't know the real processor load of the delay() (in which WIFI etc. is done), I don't really know the processor load. In other words, I don't know how much time the system spends doing system tasks in the delay(150).
Is there a way to find out how much of a delay is actually used for system tasks before the processor truly waits?